CONTROL INSTRUMENT FOR
TITAN SERIES CENTRAL CHILLERS

Titan
The Titan Central Chiller Control Instrument consolidates the pump controls and unit display into a single, convenient area.

The New "Top Operator™ combines three functions into one
easy-to-use operator.

The Top Operator™ includes an On / Off Switch and LED. The LED glows GREEN when the pump is on and RED when the pump has tripped off on overload.

Control Instrument: central chiller
Operator
The Titan Control Instrument is an enhanced version of the successful MZC instrument. The MZC has the experience of over 10 years of field service. The Titan Control Instrument consists of the cabinet door mounted control instrument and internal cabinet mounted intelligent zone boards.
DISPALY CONTROLS AND LIGHTS

Soft key controls are provided for selection of zone displays and setpoint. Two large display windows continuously show temperature for to process and setpoint. Temperatures can be shown in Fahrenheit or Celsius. From process temperatures can be displayed momentarily when selected by the operator. The display windows also display setup options.

Status lights are provided for seven system components: probe, low flow, high pressure, low pressure, low oil, compressor and freezestat.

Status condition is indicated by multi-colored LED’s. Solid green indicates the component is at the run condition. Flashing red indicates that an error condition exists. Solid red indicates that an error condition was once present, but is now in an acceptable run condition. Pressing the ‘select’ button changes a solid red indication into a solid green indication.


The Titan instrument provides an alarm status light on the display, as well as an audible and visual alarm beacon. A selectable refrigeration zone lead/lag mode is a standard feature of the Titan instrument.

SPI communication is provided via the DB-9 interface. The instrument provides a monitoring system where the communication light will flash green during titan to host communication and will flash yellow during host to titan communication.

Multi-function start / stop operators provide status and control of each pump individually. Pump on / off and overload status are provided. Optional phase loss protection and interface to other process equipment is available. An emergency stop button is also included.
Empty
Advantage Engineering Heat Transfer Eqipment
Empty
Empty
Empty
SEARCH:

search tips
Home | About Us | What's New | Literature | Products | Sales | Service | Local Representatives | Contact Us

ADVANTAGE PRODUCTS

Temperature Control Units
Temperature
Control Units
Portable Liquid Chillers
Liquid Chillers
Portable Units
Central Liquid Chillers
Liquid Chillers
Central Units
Pump Tank Stations
Pump Tanks
Stations
Cooling Towers
Cooling Tower
Cells
Filters
Filters and
Other Products

Temperature Control Units | Liquid Chillers | Evaporative Cooling Towers | Circulating Pumps & Reservoirs
Home | About Us | What's New | Literature | Products | Sales | Service | Local Representatives | Contact Us

ADVANTAGE ENGINEERING, INC. 525 East Stop 18 Road, Greenwood, IN 46142 Phone: 317-887-0729   Fax: 317-881-1277
Privacy Statement and Terms of Use.    Sitemap   ©1998 - 2005 ADVANTAGE ENGINEERING, INC

Since product innovation and improvement is our constant goal, all features and specifications are subject to change without notice or liability.


All products assembled in the United States of America.